Building permits in Scottsdale, AZ

Early Arizona guides. getPermit is California-first — these pages share what we've verified in Arizona so far, and they don't mean getPermit covers Arizona yet. Join the waitlist with your city to tell us where to go deeper.

Scottsdale (Maricopa County) adopts its own building code editions — Arizona has no statewide building code — and runs its own permit intake, forms, fees, and inspections. Here's what we've verified and where to confirm the specifics.

Scottsdale's Planning & Development moved permitting to the SPUR portal in January 2026 and enforces the 2021 International Codes and 2020 NEC, in effect since January 1, 2023. Like-for-like AC and air handler replacements, water heaters, and new or altered electrical circuits are listed as Minimum Permits, same-material re-roofs need no permit, and residential solar arrays that meet the City's guidelines get a small-scope review. Electrical service upgrades above 200 amps are plan reviewed.

Verified local data — Scottsdale

Every fact below is sourced from a public City of Scottsdale document or portal page. Each carries the source URL and the date we last verified it. Full dataset last re-verified .

Permit portal
Scottsdale SPUR (Smart Planning, Use and Regulations)

verified Sep 13, 2026 · source · Launched January 2026, replacing the eServices portal; projects initiated after January 6, 2026 are managed in SPUR, while eServices serves older projects

Submission methods

Online · In-person

verified Sep 13, 2026 · source · Permit applications are submitted through SPUR; payments are also accepted in person at the One Stop Shop

Adopted code edition

2021 IBC, IRC, IMC, IPC, IFGC, IECC, IFC, IEBC, ISPSC, and IgCC, and the 2020 NEC

verified Sep 13, 2026 · source · Effective January 1, 2023, with the IRC and IECC amendments effective January 7, 2023 and the IgCC effective July 1, 2023; code adoption history — https://www.scottsdaleaz.gov/docs/default-source/scottsdaleaz/codes---ordinances/building-codes/code-adoption-history.pdf?sfvrsn=12050a91_2

Fee schedule
FY 2026/27 Permit Fee Schedule (Resolution No. 13661), effective July 1, 2026

verified Sep 13, 2026 · source · Trade permit fee lines are in the miscellaneous schedule — https://www.scottsdaleaz.gov/docs/default-source/scottsdaleaz/planning---develpment/fees-fy26-27/permit-fee-schedule---miscellaneous.pdf

Other local notes

  • Replacing an air conditioner or air handler in the same location, like for like only, is listed as a Minimum Permit example; minimum permits require a progress inspection and a final inspection.

    verified Sep 13, 2026 · source

  • A permit is required to replace a water heater; a replacement in the same location uses a minimum Water Heater Permit.

    verified Sep 13, 2026 · source

  • Adding a new or altering an existing electrical circuit is listed as a Minimum Permit example.

    verified Sep 13, 2026 · source

  • According to the City's Permit Services page, plan review is not required for most single-family residential electrical, mechanical, and plumbing work.

    verified Sep 13, 2026 · source · The Home Improvement page says work not listed as a minimum permit requires a formal plan submittal — confirm with the City for jobs not on that list: https://www.scottsdaleaz.gov/planning-development/home-improvement

  • Re-roofing with the same roofing material needs no permit.

    verified Sep 13, 2026 · source

  • Residential solar arrays that meet the City's submittal guidelines get a small-scope review; others, including ground-mounted arrays, get a full plan review.

    verified Sep 13, 2026 · source

  • Residential electrical service upgrades above 200 amps are plan reviewed, with a site plan, a single-line diagram, and NEC Article 220 load calculations.

    verified Sep 13, 2026 · source · The handout cites the 2005 NEC and predates the currently adopted code

  • Permit applications ask for the contractor's ROC number and City of Scottsdale tax license number.

    verified Sep 13, 2026 · source

  • Inspections are requested in SPUR; inspection hours are 6 a.m. to 2:30 p.m. from April through October and 7 a.m. to 3:30 p.m. from November through March.

    verified Sep 13, 2026 · source

  • Work completed without a permit is fined an amount equal to double the permit fee.

    verified Sep 13, 2026 · source

Official building department

City of Scottsdale Planning & Development

Verified Scottsdale specifics are shown above. For project-specific fees, timelines, and counter staff, this department is the authority.

Common jobs in Scottsdale

The general Arizona guide for each job. Scottsdale's verified local data, including job-by-job permit notes, is shown above.

Want getPermit to map Scottsdale in depth?

Join the waitlist with your city and trade. We prioritize the jurisdictions our early users actually work in — and we'll never invent fees or timelines we haven't verified.

Join the waitlist