Panel upgrade permits in Arizona
Last updated September 13, 2026
Early Arizona guides. getPermit is California-first — these pages share what we've verified in Arizona so far, and they don't mean getPermit covers Arizona yet. Join the waitlist with your city to tell us where to go deeper.
A plain-English starting point for electrical contractors. This is general Arizona guidance — fees, forms, and timelines are set by each city.
Short answer
A panel replacement or service upgrade generally needs an electrical permit in Arizona. Upgrades up to 200 amps are often quick — Phoenix issues them over the counter and unincorporated Maricopa County classifies them as Non-Technical permits — while larger services go to plan review with load calculations and a one-line diagram. The utility controls the disconnect and reconnect. The work is done by an ROC-licensed electrical contractor.
The general picture
Replacing a panel or upgrading a service is permitted electrical work, and in Arizona the process scales with size. Up to 200 amps, the permit is often quick: Phoenix issues it over the counter and unincorporated Maricopa County classifies it as a Non-Technical permit. Above 200 amps, expect plan review with a site plan, one-line diagram, and load calculations — Scottsdale plan-reviews service upgrades above 200 amps. The utility is the other half of the job: APS, SRP, or a city utility like Mesa's schedules the disconnect, and service comes back only after the jurisdiction clears the work. See the verified notes for Phoenix, Mesa, Scottsdale, and unincorporated Maricopa County.
Typically needs a permit
Replacing a panel or meter base, increasing the service size, adding a subpanel, or relocating the service. Replacing breakers in kind is usually exempt — but not the service disconnect.
Usually doesn't (general norm)
- Replacing a breaker or fuse in kind, other than the service disconnect
- Replacing a receptacle or switch like for like
Documents & plans generally required
- Electrical permit application with the existing and new service size
- ROC license number and class
- Load calculation (NEC Article 220) for a service increase
- One-line diagram and panel schedule, especially above 200 amps
- Site plan showing the meter and service location if it moves
- Service upgrade request with the serving utility
Common reasons panel upgrade applications get bounced
Code-rooted patterns across Arizona — not a city-specific rejection rate.
- No load calculation for a service size increase
- Service relocated without a site plan or utility coordination
- Working space in front of the panel doesn't meet NEC 110.26
- Grounding and bonding not brought up to the adopted NEC
- Utility wires or meter disconnected without scheduling it with the utility
- Plans for a larger service not prepared by a qualified designer where the jurisdiction requires one
The inspection sequence
A typical order — the number of stops and exact sequence vary by jurisdiction and scope.
- 1Rough or service inspection while trenches or walls are open, when applicable
- 2Final inspection, after which the jurisdiction sends its electrical clearance to the utility
- 3Utility meter set and reconnection
Licensing — who can pull it
Panel and service upgrades in Arizona are done by an ROC-licensed electrical contractor — R-11 (residential), CR-11 (dual), or C-11 (commercial). An air-conditioning contractor's R-39 license covers equipment circuits, not a new panel.
How this works in your Arizona city
Cities marked have verified local data — portal, fee schedule, adopted code edition, and local permit notes sourced from public city and county documents. Every city page links to its official building department.
Frequently asked questions
Do I need a permit to upgrade to a 200-amp panel in Arizona?
Generally yes. In Phoenix, service upgrades up to 200 amps are over-the-counter express permits; in unincorporated Maricopa County they're Non-Technical permits. Larger services go to plan review.
Who disconnects the power for a panel upgrade?
The serving utility. Mesa, for example, tells contractors not to disconnect utility wires or meters and to schedule disconnects and reconnects with the utility. APS requires its own inspection when a meter is relocated or replaced, and SRP restores service after the jurisdiction's electrical clearance.
When do I need a load calculation?
Whenever the service size increases, and for larger services generally. Above 200 amps, expect a one-line diagram and NEC Article 220 load calculations as part of plan review.