Building permits in Unincorporated Maricopa County, AZ

Early Arizona guides. getPermit is California-first — these pages share what we've verified in Arizona so far, and they don't mean getPermit covers Arizona yet. Join the waitlist with your city to tell us where to go deeper.

Unincorporated Maricopa County adopts its own building code editions — Arizona has no statewide building code — and runs its own permit intake, forms, fees, and inspections. Here's what we've verified and where to confirm the specifics.

Maricopa County's Planning & Development Department permits work in unincorporated areas through its online Permit Center, under the 2018 International Codes and 2017 NEC with local amendments; an update to the 2024 codes and 2023 NEC has a Board of Supervisors hearing tentatively set for October 21, 2026. The County exempts in-kind outdoor AC units of 5 tons or less, water heater replacements, and same-material re-roofs, issues A/C and HVAC permits automatically online, and accepts SolarAPP+ for residential rooftop solar.

Verified local data — Unincorporated Maricopa County

Every fact below is sourced from a public Maricopa County document or portal page. Each carries the source URL and the date we last verified it. Full dataset last re-verified .

Permit portal
Permit Center

verified Sep 13, 2026 · source · Launched June 2024, replacing the County's Accela system; permit fees are paid only through the Permit Center

Submission methods

Online

verified Sep 13, 2026 · source · Nearly all Planning and Development applications must be submitted online

Adopted code edition

2018 IBC, IRC, IPC, IMC, IFGC, and IEBC, and the 2017 NEC, with AZBO/MAG amendments; the 2018 IECC is voluntary

verified Sep 13, 2026 · source · Adopted by the Board of Supervisors on August 17, 2022; the County's Local Additions and Addenda list the 2018 IECC as voluntary — https://www.maricopa.gov/DocumentCenter/View/5808/Local-Additions-and-Addenda-PDF. An update to the 2024 International Codes and 2023 NEC (TA2026001) has a Board of Supervisors hearing tentatively set for October 21, 2026 — https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10420?fileID=101961

Fee schedule
Summary of the Fee Schedule (June 2024)

verified Sep 13, 2026 · source · The summary is dated June 2024 and states no effective date

Other local notes

  • In-kind replacement of an outdoor refrigeration unit of 5 tons or less, in the same location and weighing no more than the original, is exempt from a permit.

    verified Sep 13, 2026 · source · Local Additions and Addenda §105.2

  • A/C, evaporative cooler, and HVAC permits are Web-Issued — fully automated online permits.

    verified Sep 13, 2026 · source

  • Permits are no longer required to replace an existing water heater when the work follows the manufacturer's specifications.

    verified Sep 13, 2026 · source · Local Additions and Addenda §105.2 limits the exemption to in-kind storage tank replacement by a licensed contractor and excludes instant-hot on-demand water heaters — https://www.maricopa.gov/DocumentCenter/View/5808/Local-Additions-and-Addenda-PDF

  • Replacing a roof with the same type of material as the original roofing is exempt from a permit.

    verified Sep 13, 2026 · source · Local Additions and Addenda §105.2

  • Electrical upgrades of 0 to 200 amps are Non-Technical permits; services over 200 amps go to technical/standard review with a site plan.

    verified Sep 13, 2026 · source

  • Residential rooftop solar can be permitted through SolarAPP+ by licensed photovoltaic contractors.

    verified Sep 13, 2026 · source

  • Buried gas piping must be at least 12 inches deep, or 18 inches for plastic pipe, under the County's fuel gas code amendments.

    verified Sep 13, 2026 · source · Local Additions and Addenda, IFGC §404.12

  • Septic system alterations go through the County's Environmental Services Department, which releases building permits for unincorporated areas once the on-site wastewater system is approved.

    verified Sep 13, 2026 · source

  • Written documentation of an Arizona licensed contractor or owner-builder classification is required for all building permits.

    verified Sep 13, 2026 · source

  • A County permit is needed only for work in unincorporated Maricopa County; projects inside a city or town start with that city or town.

    verified Sep 13, 2026 · source

Official building department

Maricopa County Planning & Development Department

Verified Unincorporated Maricopa County specifics are shown above. For project-specific fees, timelines, and counter staff, this department is the authority.

Common jobs in Unincorporated Maricopa County

The general Arizona guide for each job. Unincorporated Maricopa County's verified local data, including job-by-job permit notes, is shown above.

Want getPermit to map Unincorporated Maricopa County in depth?

Join the waitlist with your city and trade. We prioritize the jurisdictions our early users actually work in — and we'll never invent fees or timelines we haven't verified.

Join the waitlist