Building permits in Newport Beach, CA

Newport Beach (Orange County) follows California's statewide codes, but runs its own permit intake, forms, fees, and review timelines through its building department. Here's the general picture for the trades — and where to confirm the specifics.

Newport Beach's Building Division (Community Development) takes permits and plan checks online around the clock through the CiViC Online Portal, and in person at the public counter in the Civic Center, 100 Civic Center Drive. Residential Express Permits cover simple single-scope work such as furnace replacements, reroofs, or window changeouts, and new solar and energy storage submittals are online only. The 2025 California Building Standards Code took effect January 1, 2026 under Ordinance No. 2025-23, and the Fiscal Year 2026-27 Schedule of Rents, Fines and Fees sets Building & Development fees effective July 25, 2026.

Verified local data — Newport Beach

Every fact below is sourced from a public City of Newport Beach document or portal page. Each carries the source URL and the date we last verified it. Full dataset last re-verified .

Permit portal
CiViC Online Portal

verified Sep 13, 2026 · source · Permitting and plan check services available 24 hours a day, 7 days a week. The Building Division's hours page links the same portal to schedule inspections online — https://www.newportbeachca.gov/government/departments/community-development/building-division/operational-hours-staff

Submission methods

Online · In-person

verified Sep 13, 2026 · source · Public counter in the Civic Center at 100 Civic Center Drive; permit issuance and plan check submittal 7:30 AM–4:30 PM Monday–Thursday and 7:30 AM–3:30 PM Friday. Online submittal through the CiViC Online Portal

Adopted code edition

2025 California Building Standards Code

verified Sep 13, 2026 · source · Newport Beach Municipal Code Title 15 adopts the 2025 California Building (Ch. 15.04), Residential (15.05), Electrical (15.06), Mechanical (15.07), Plumbing (15.08), Green Building Standards (15.11), Historical Building (15.13), Existing Building (15.14), and Energy (15.17) Codes under Ordinance No. 2025-23, effective January 1, 2026

Fee schedule
Schedule of Rents, Fines and Fees — Fiscal Year 2026-27 (Building & Development fees effective July 25, 2026)

verified Sep 13, 2026 · source · Adopted via Resolution 2026-28 and incorporating additional fees adopted via Resolution 2026-56; most fees effective July 1, 2026, Building & Development fees effective July 25, 2026. Building fees are in the Community Development — Building section of the PDF

Other local notes

  • Community Development main line: (949) 644-3200 · Permit Counter: (949) 718-1888. Counter hours: 7:30 AM–5:30 PM Monday–Thursday, 7:30 AM–4:30 PM Friday.

    verified Sep 13, 2026 · source

  • Businesses based outside Newport Beach that conduct activity in the City — contractors included — must file a City Business License Tax application.

    verified Sep 13, 2026 · source

  • Residential Express Permits (single-family/duplex stand-alone projects) cover simple single-scope work such as a new ceiling fan, furnace replacement, reroofing, or window and door changeouts; they are not for remodels or projects that require multiple permits and plan review.

    verified Sep 13, 2026 · source

  • Per the city's CiViC inspection-scheduling guide, you do not need to be a contact on the permit to schedule an inspection, but you do need a CiViC account.

    verified Sep 13, 2026 · source

  • Since August 1, 2024, all new photovoltaic and energy storage system submittals are online only; single-family and duplex residential projects are eligible only through SolarAPP+, and other solar projects are submitted through CiViC.

    verified Sep 13, 2026 · source

  • Online plan submittals: upload complete construction plans as a single combined PDF that is not password protected, printed landscape, and to scale.

    verified Sep 13, 2026 · source

Official building department

City of Newport Beach Community Development — Building Division

Verified Newport Beach specifics are shown above. For project-specific fees, timelines, and counter staff, this department is the authority.

Permits by trade in Newport Beach

Common jobs in Newport Beach

Each job below is combined with Newport Beach's verified permit data — portal, fee schedule, and adopted code edition.

Want getPermit to map Newport Beach in depth?

Join the waitlist with your city and trade. We prioritize the jurisdictions our early users actually work in — and we'll never invent fees or timelines we haven't verified.

Join the waitlist