EV charger install permits in Long Beach, CA

General California guidance last updated October 12, 2026 · Long Beach data fully re-verified

What electrical contractors need to know about pulling a ev charger install permit in Long Beach (Los Angeles County).

Short answer

In California, a hardwired Level 2 EV charger (EVSE) install needs an electrical permit because it adds a dedicated circuit and load — generally pulled by a licensed C-10 contractor under the California Electrical Code (Title 24, Part 3, Articles 625 and 220). Most California cities now offer streamlined or instant residential EV-charger permitting under SB 1222 / AB 1236.

Long Beach accepts submittal through the LB Services — Permitting and Licensing and has adopted the 2025 California Building Standards Code (with the Long Beach Municipal Code). Fee details and sources are below.

Long Beach permit data

Sourced from public City of Long Beach documents — every field carries the source URL and verification date.

Permit portal
LB Services — Permitting and Licensing

verified Aug 10, 2026 · source · The city's online permit system covers express permits — renewable energy (PV, ESS, EV chargers), reroofs, electrical panel/subpanel changeouts, water heater changeouts for single-family/duplex dwellings, and certain commercial project types

Adopted code edition

2025 California Building Standards Code (with the Long Beach Municipal Code)

verified Aug 10, 2026 · source · Effective January 1, 2026, all projects must comply with the 2025 Edition of the California Building Standards Code and the Long Beach Municipal Code (LBMC) to receive approval, as required by state law

Fee schedule
Building Plan Review & Permit Fees — fee changes effective October 1, 2026

verified Oct 12, 2026 · source · Linked as "Building Permit & Plan Check Fees" on the fee-schedules listing page; separate schedules for electrical, plumbing, mechanical, and fire fees are published on the same page

The general picture in California

Adding a hardwired EV charger to a residence or workplace nearly always requires an electrical permit. The install adds a dedicated 240V circuit, typically requires a load calculation against the existing service, and may trigger a panel upgrade if the existing service can't carry the new load. California state law (AB 1236, then SB 1222) requires expedited residential EV-charger permitting — many cities issue same-day or via an online checklist. Plug-in Level 1 chargers using an existing 120V outlet generally don't require a permit; a new dedicated 120V or 240V circuit does.

For deeper background that isn't Long Beach-specific, see the statewide ev charger install guide.

Code basis

2025 California Building Standards Code (Title 24), which applies to permit applications filed on or after per the California Building Standards Commission. Sections checked against the published code; cities may add local amendments.

  • California Residential Code (Title 24, Part 2.5) §R105.1 — Any owner or agent who intends to install, alter or replace an electrical system must first obtain a permit (CBC §105.1 says the same for other buildings). §R105.2 exempts connecting approved portable equipment to an approved, permanently installed receptacle, which is the plug-in Level 1 case, not a new circuit.

    source

  • California Electrical Code (Title 24, Part 3) Article 625 — Electric Vehicle Power Transfer System: the EVSE circuit, equipment listing and ventilation (§625.52); California's §625.1.1 ties EV charging in new construction to CALGreen. The 2025 CEC is the 2023 NEC with California amendments.

    source

  • California Electrical Code (Title 24, Part 3) Article 220 — Branch-Circuit, Feeder, and Service Load Calculations: the load calculation that shows the charger fits the existing service or that a service upgrade is needed.

    source

  • California Green Building Standards Code (CALGreen) (Title 24, Part 11) — CALGreen's EV-charging readiness rules (Chapter 4, Residential Mandatory Measures) apply to new construction, per CEC §625.1.1, not to adding a charger to an existing home.

    source · part verified; section not cited

Typically needs a permit

EV charger install itself triggers a permit in nearly every California jurisdiction, Long Beach included. Long Beach-specific variations are confirmed with the issuing department above.

Usually doesn't (general norm)

  • Plugging a portable Level 1 charger into an existing, properly-rated receptacle with no new circuit
  • Replacing one EVSE with another of the same output on the same existing circuit (verify locally — some cities still require a permit)

Documents & plans generally required

Common reasons ev charger install applications get bounced

Code-rooted patterns across California — not a Long Beach-specific rejection rate.

The inspection sequence

A typical order — the number of stops and exact sequence vary by jurisdiction and scope.

  1. 1Rough inspection if conduit/wiring is concealed before cover
  2. 2Service inspection only if the install includes a panel/service upgrade
  3. 3Final inspection with the EVSE installed, energized, and tested

Licensing — who can pull it

EV-charger installations in California are generally performed by a C-10 (Electrical) licensed contractor; a B (General Building) contractor may pull within a larger project under CSLB rules. The licensed contractor doing the work typically pulls the permit.

Other verified Long Beach notes

Frequently asked questions

Do I need a permit for a Level 2 home EV charger in California?

Generally yes. A hardwired Level 2 EVSE adds a dedicated 240V circuit and is treated as new electrical work — California cities almost universally require a permit. State law (SB 1222) further requires expedited, often online, residential EV-charger permitting.

What about a plug-in Level 2 charger on an existing 240V outlet?

If the 240V receptacle is existing, properly rated for the load, and installed under the original permit, plugging in a portable EVSE usually doesn't trigger a new permit. Installing a new 240V receptacle for that purpose does — that is a new branch circuit.

Will I need a panel upgrade?

It depends on the load calculation. Many homes — especially older ones with 100A service — exceed capacity once an EV charger is added. Load-management devices (EVEMS) can sometimes avoid a panel upgrade by limiting EV draw when the rest of the house is using power.

Can the homeowner pull the permit?

California allows homeowners to perform certain work on their own primary residence, but the work must still meet code and be inspected. getPermit is built for licensed contractors — for owner-pulled permits, contact the city directly.

Want getPermit to map Long Beach in depth?

Join the waitlist with your city and trade. We prioritize the jurisdictions our early users actually work in — and we'll never invent fees or timelines we haven't verified.

Join the waitlist