Building permits in Long Beach, CA

Long Beach (Los Angeles County) follows California's statewide codes, but runs its own permit intake, forms, fees, and review timelines through its building department. Here's the general picture for the trades — and where to confirm the specifics.

Long Beach splits permitting by complexity: express-eligible work — solar and energy storage, EV chargers, reroofs, panel changeouts, water heaters — is auto-issued in one step through the LB Services online portal (registered contractors with a department PIN only, available even after hours), while everything needing plan review starts at the Development Permit Center at 411 W. Ocean Blvd. with digital PDFs on a USB drive. Effective January 1, 2026 all projects must comply with the 2025 California Building Standards Code and the LBMC, and the current Building Plan Review & Permit Fees schedule carries fee changes effective October 1, 2026. Inspections are scheduled online only.

Verified local data — Long Beach

Every fact below is sourced from a public City of Long Beach document or portal page. Each carries the source URL and the date we last verified it. Full dataset last re-verified .

Permit portal
LB Services — Permitting and Licensing

verified Aug 10, 2026 · source · The city's online permit system covers express permits — renewable energy (PV, ESS, EV chargers), reroofs, electrical panel/subpanel changeouts, water heater changeouts for single-family/duplex dwellings, and certain commercial project types

Submission methods

Online · In-person

verified Aug 10, 2026 · source · Express-eligible work issues online; every other permit application starts at the Development Permit Center with construction documents — accepted as digital PDFs on a USB device at the counter

Adopted code edition

2025 California Building Standards Code (with the Long Beach Municipal Code)

verified Aug 10, 2026 · source · Effective January 1, 2026, all projects must comply with the 2025 Edition of the California Building Standards Code and the Long Beach Municipal Code (LBMC) to receive approval, as required by state law

Fee schedule
Building Plan Review & Permit Fees — fee changes effective October 1, 2026

verified Oct 12, 2026 · source · Linked as "Building Permit & Plan Check Fees" on the fee-schedules listing page; separate schedules for electrical, plumbing, mechanical, and fire fees are published on the same page

Other local notes

  • Development Permit Center: 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802; 562.570.PMIT (7648); open from 8 AM weekdays and closed daily for lunch from noon to 1 PM.

    verified Aug 10, 2026 · source

  • Online permitting is available only to registered licensed California contractors holding a pre-authorized Personal Identification Number (PIN) issued by the department, for minor or simple projects.

    verified Aug 10, 2026 · source

  • Building inspections must be scheduled online — the city does not accept phone requests for building inspections.

    verified Aug 10, 2026 · source

  • Express online permits are applied for and automatically issued in one step — available outside regular business hours as well.

    verified Aug 10, 2026 · source

Official building department

Long Beach Community Development — Building & Safety Bureau

Verified Long Beach specifics are shown above. For project-specific fees, timelines, and counter staff, this department is the authority.

Permits by trade in Long Beach

Common jobs in Long Beach

Each job below is combined with Long Beach's verified permit data — portal, fee schedule, and adopted code edition.

Want getPermit to map Long Beach in depth?

Join the waitlist with your city and trade. We prioritize the jurisdictions our early users actually work in — and we'll never invent fees or timelines we haven't verified.

Join the waitlist