Sewer line replacement permits in Long Beach, CA
General California guidance last updated May 22, 2026 · Long Beach data verified August 10, 2026
What plumbing contractors need to know about pulling a sewer line replacement permit in Long Beach (Los Angeles County).
Short answer
In California, replacing a sewer lateral or building drain needs a plumbing permit, pulled by a licensed C-36 (Plumbing) or C-42 (Sanitation) contractor under the California Plumbing Code (Title 24, Part 5). The work often coordinates with the city's wastewater utility, and an encroachment / right-of-way permit is generally required when work extends into the public right-of-way.
Long Beach accepts submittal through the LB Services — Permitting and Licensing and has adopted the 2025 California Building Standards Code (with the Long Beach Municipal Code). Fee details and sources are below.
Long Beach permit data
Sourced from public City of Long Beach documents — every field carries the source URL and verification date.
- Permit portal
- LB Services — Permitting and Licensing
verified Aug 10, 2026 · source · The city's online permit system covers express permits — renewable energy (PV, ESS, EV chargers), reroofs, electrical panel/subpanel changeouts, water heater changeouts for single-family/duplex dwellings, and certain commercial project types
- Adopted code edition
2025 California Building Standards Code (with the Long Beach Municipal Code)
verified Aug 10, 2026 · source · Effective January 1, 2026, all projects must comply with the 2025 Edition of the California Building Standards Code and the Long Beach Municipal Code (LBMC) to receive approval, as required by state law
- Fee schedule
- Building Permit & Plan Check Fees — fee changes effective May 20, 2026
verified Aug 10, 2026 · source · Separate schedules for electrical, plumbing, mechanical, and fire fees are published on the same fee-schedules listing page
The general picture in California
A sewer-line replacement covers the building's drain from the foundation out to the city main (or septic). The permit covers pipe material (typically ABS, PVC SDR-35, or cast iron for certain conditions), slope, bedding, cleanouts, backwater valve (required by ordinance in many California cities on lateral replacements), and connection to the city main. Trenchless methods — pipe bursting and cured-in-place pipe (CIPP) lining — are common and have their own submittal requirements. Work in the public right-of-way (between the property line and the main) often requires a separate encroachment permit from public works on top of the building permit.
For deeper background that isn't Long Beach-specific, see the statewide sewer line replacement guide.
Typically needs a permit
Sewer line replacement itself triggers a permit in nearly every California jurisdiction, Long Beach included. Long Beach-specific variations are confirmed with the issuing department above.
Usually doesn't (general norm)
- Clearing a drain stoppage with a snake or hydro-jet
- Repairing a single broken section of accessible pipe with the same material
- Camera-inspecting an existing lateral for diagnostics
Documents & plans generally required
- Plumbing permit application (plus encroachment / right-of-way permit if work crosses the property line)
- Contractor license and city business registration
- Site/plot plan showing the lateral route, depth, slope, and tie-in point at the main
- Pipe material, diameter, and class (ABS, PVC SDR-35, lined CIPP, etc.)
- Cleanout locations — at the building, at the property line, and at directional changes per code
- Backwater-valve detail where required by ordinance or where a fixture is below the next upstream manhole rim
- Trenchless method detail for pipe-bursting or CIPP (bursting head, host-pipe condition, liner thickness, cure method)
- Bedding and backfill specs
Common reasons sewer line replacement applications get bounced
Code-rooted patterns across California — not a Long Beach-specific rejection rate.
- Slope insufficient — CPC minimums are typically 1/4-inch per foot for 3-inch and smaller, 1/8-inch per foot for 4-inch and up
- Missing cleanout at required locations (base of stack, property line, every 100 feet, and at direction changes)
- No backwater valve where the ordinance requires one — common in flood-prone or older sewered areas
- Pipe class not appropriate for cover depth or loading conditions
- Tie-in at the city main not coordinated with public works / wastewater utility
- Trenchless application missing host-pipe condition or liner-thickness calculation
The inspection sequence
A typical order — the number of stops and exact sequence vary by jurisdiction and scope.
- 1Pre-cover inspection with the new pipe in place, sloped, supported, and air/pressure-tested
- 2Right-of-way / utility inspection at the connection to the city main (when applicable)
- 3Final inspection with backfill, restoration, and any required surface work complete
Licensing — who can pull it
Sewer-line replacement in California is generally performed by a C-36 (Plumbing) or C-42 (Sanitation) licensed contractor; a B (General Building) contractor may pull within a larger project under CSLB rules. The licensed contractor doing the work typically pulls the permit; work in the public right-of-way may also require a separate encroachment-permit filing.
Other verified Long Beach notes
Development Permit Center: 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802; 562.570.PMIT (7648); open from 8 AM weekdays and closed daily for lunch from noon to 1 PM.
verified Aug 10, 2026 · source
Online permitting is available only to registered licensed California contractors holding a pre-authorized Personal Identification Number (PIN) issued by the department, for minor or simple projects.
verified Aug 10, 2026 · source
Building inspections must be scheduled online — the city does not accept phone requests for building inspections.
verified Aug 10, 2026 · source
Express online permits are applied for and automatically issued in one step — available outside regular business hours as well.
verified Aug 10, 2026 · source
Frequently asked questions
Do I need a permit to replace a sewer lateral in California?
Yes — replacing the building lateral (from the foundation to the city main) is permitted plumbing work in every California jurisdiction. Work in the public right-of-way usually requires an additional encroachment / right-of-way permit from the city's public works department.
What is a backwater valve and when is it required?
A backwater valve prevents sewer backflow into the building during a main-line surcharge. The California Plumbing Code requires one when any fixture is below the next upstream manhole rim; many California cities require one on every lateral replacement regardless. Check the local ordinance.
Do trenchless methods (pipe bursting, CIPP) need a permit?
Yes — trenchless methods need the same plumbing permit, plus submittal details specific to the method: host-pipe condition, bursting head size or liner thickness, and cure procedure. Inspection sequencing may differ — some jurisdictions verify the lined pipe with a post-install camera inspection.
Who connects to the city main?
The contractor performs the tie-in, but the city's public works or wastewater utility typically inspects (or requires advance notice of) the connection. Encroachment permits cover the work in the right-of-way; some cities require their own crew to perform the actual tap.