California permit guides for contractors
How permitting works across California: the process, inspections, review times, and what outside help costs. Fees, forms, and timelines for a specific city live in the city guides.

Start here
California building permit basics for contractors
How construction permits actually work in California: why it's fragmented, what an AHJ is, how an application flows from intake to inspections, what triggers a permit, and which CSLB license pulls it.

Express, over-the-counter and same-day permits: four small jobs in 31 California jurisdictions
Whether 31 California building departments say they issue a water heater, panel upgrade, reroof or HVAC changeout permit on payment, over the counter, the same day or without plan review. Every cell links the jurisdiction's own page and quotes it; cells without evidence read "not established".
Express permitsOver the counterSmall jobsUpdated
Pricing the permit on a small job: water heater permit fees in 31 California jurisdictions
What goes into the permit line on a small California job: the city fee, preparation time, inspection attendance and re-inspection risk. Then one job, a water heater replacement, priced from the fee schedule of each of 31 California jurisdictions, with every cell linked to the schedule and the date it was read.
Permit feesWater heatersEstimatingUpdated
CF1R, CF2R, CF3R and the HERS rater on California HVAC and water heater changeouts
The three Title 24 Energy Code forms on a California changeout, compared in one table: the CF1R (Certificate of Compliance), the CF2R the installer signs and the CF3R the ECC-Rater (still called the HERS rater) signs. When an AC, furnace, heat pump, duct or water heater job needs rater verification under 2025 Energy Code §150.2(b), the order of the paperwork, and a one-screen checklist.
Title 24HERS / ECC-RaterChangeoutsUpdated
California permit laws taking effect 2027 to 2028: heat pumps, remote inspections, plan check, EV chargers, and ADUs
Five California laws signed in 2026 take effect January 1, 2027, with new duties phasing in through July 1, 2028: a heat pump permit fee cap and real-time online permits (SB 222, Gov. Code §51297.50 et seq.), remote inspections (AB 1738), a two-review plan check limit (AB 1621), EV charger approvals (SB 1283), and ADU impact fees (SB 1117). Dates, exceptions, and code sections.
New lawsHeat pumpsDeadlinesUpdated
Skipping the permit: what unpermitted work costs a California contractor
What a licensed California contractor risks by doing permit-required work without the permit: CSLB discipline and a civil penalty of $1,500 to $30,000 (Business and Professions Code §§7090, 7099.2, 7110), the building department's stop work order and added fees, civil exposure, how a permit after the fact works, and a note to send a customer who asks to skip it.
Unpermitted workCSLB disciplineAfter-the-fact permitsUpdated
Which California contractor license can pull which permit
Which CSLB license class may take the job, and so apply for the permit, in California: C-10, C-20, C-36, C-46, B and B-2 compared in one table, owner-builder versus contractor, the $1,000 minor-work exemption that is not a permit exemption (Business and Professions Code §7048), and what the law says about pulling a permit for a job that isn't yours (§7114).
License classesOwner-builderLending a licenseUpdated
California permit glossary for contractors
Definitions of the permit terms California trade contractors hit: AHJ, Title 24, plan check, correction cycle, the CSLB C-10/C-36/C-20/C-46/C-39 licenses, submittal, and changeout.
DefinitionsLicense classesTitle 24Updated
California building inspections: what gets checked, how to schedule, and the new remote-inspection rules
How permit inspections work in California: the rough and final checks for each trade, how to request one, what a failed inspection means, how to look up a permit's status, and the remote and asynchronous inspections cities must offer under AB 1738 and SB 222.
InspectionsRemote inspectionsPermit statusUpdated
How long does a California building permit take? The legal clocks and AB 1621
California has no statewide permit timeline. For housing projects, Gov. Code §65913.3 sets review clocks, and from January 1, 2027, AB 1621 (Chapter 780, Statutes of 2026) bars cities from requiring or requesting more than two plan check reviews for their building permits.
Review timesPlan checkHousing permitsUpdated
What a permit expediter costs in California, and when it pays off
What permit expediters do, how their pricing is typically structured in California, what drives the cost up, and the alternatives for trade contractors who pull their own permits.
ExpeditersCostsAlternativesUpdated
Pulling permits in California?
Join the waitlist. We prioritize the cities and trades our early users work in.