Guide · Permit fees

Pricing the permit on a small job: water heater permit fees in 31 California cities

What goes into the permit line on a small California job: the city fee, preparation time, inspection attendance and re-inspection risk. Then one job, a water heater replacement, priced from the fee schedule of each of 31 California jurisdictions, with every cell linked to the schedule and the date it was read.

Updated 12 min readPermit feesWater heatersEstimating
A new white tank water heater strapped to a red two-wheel hand truck in the concrete side yard of a stucco house, the louvered door of an exterior water heater closet open behind it, the old rust-stained tank standing disconnected against the wall, and a plumber in a hard hat and hi-vis vest writing on a clipboard by a wooden side gate under a palm tree
On this page
  1. What goes into the permit line
  2. What a failed inspection costs
  3. Water heater permit fees in 31 California jurisdictions
  4. The state fees on top
  5. Why the city fee differs
  6. Before you quote the permit line

On a small job the permit line is easy to underprice. The city fee is the part you can look up; the rest is your time to prepare the application, to meet the inspector, and to come back if the job fails. The table below prices one job, a water heater replacement in a single-family home, from the fee schedule of each of the 31 California jurisdictions getPermit covers (30 cities and unincorporated Los Angeles County). Every fee links to the city's own schedule, read on November 14, 2026. This is not legal or tax advice.

What goes into the permit line

  • The city fee. What the city's adopted fee schedule charges for the work: a flat permit fee, a per-item fee plus an issuance fee, an hourly rate, or a share of the contract price. Many schedules add a technology, records or processing fee on top.
  • Preparation. Finding the right permit type, filling the application, attaching what the city asks for, and paying. Some cities show what this time costs them: San Jose bills permit issuance at $211 an hour or the scheduled amount, whichever is greater (FY 2026-27 Building Division Fee Schedule, p. 9). For energy forms on the job, see CF1R, CF2R, CF3R and the HERS rater.
  • Inspection attendance. Someone has to be on site, or reachable for a remote inspection, during the city's inspection window. That is a trip and a wait, separate from the work itself. How the visit runs is in California building inspections for contractors.
  • Re-inspection risk. A failed or missed inspection means another trip and, in many cities, another fee. The fees are in the next section.

What a failed inspection costs

Many cities charge again when an inspection fails or the job isn't ready. The five schedules below state a re-inspection fee in dollars. Some cities include a set number of inspections in the permit fee and charge only past it, so read the line in your city's schedule before you price the risk.

CityRe-inspection fee as the schedule states itScheduleRead on
Huntington Beach$208 reinspection fee (B-17)Master Fee and Charges Schedule, effective July 1, 20262026-11-14
Mountain View$437 per reinspection when there's no one to attend or the job isn't inspection-readyBuilding Permit Fees, effective August 22, 20262026-11-14
San Francisco$259 per half hour for a re-inspection or additional inspectionTable 1A-C, permits issued on and after July 12, 20262026-11-14
San Jose$315 an hour, 30-minute minimumBuilding Division Fee Schedule FY 2026-27, effective August 10, 2026 (p. 9)2026-11-14
Santa Monica$183 on a residential single-trade permitFees and Rates, FY 2026-272026-11-14

Water heater permit fees in 31 California jurisdictions

The 31 schedules price a water heater permit in several ways. Some charge one flat fee, some a per-heater fee on top of an issuance fee, some inspection time by the hour, and one the greater of a flat fee or a share of the contract price. Two name no water heater item and don't make clear which of their fees applies.

The job is a like-for-like tank water heater replacement in a single-family home. Where a schedule prices a tankless or heat pump unit differently, the cell says so. Where a schedule has no water heater line but a rule for any residential plumbing or single-trade permit (Santa Monica, Sunnyvale), the cell gives that rule and says so; where the schedule leaves it unclear (Long Beach, San Francisco), the cell reads "not established". A heat pump or electric unit can also need an electrical permit, which the table doesn't cover. The table doesn't total, average or rank the fees. The fees aren't for the same bundle of work, so a total or an average would match no city.

JurisdictionFee as the schedule states itScheduleRead on
Anaheim$78 per water heater and/or vent; $188 minimum permit feePlumbing Permit Fees, Exhibit E (no date printed; the current schedule on the Building Division's Fees page)2026-11-14
Berkeley$150 plumbing base permit fee, plus $12.20 per water heaterPlanning and Development Fee Schedule, effective July 1, 2026 (VII. Plumbing Permits)2026-11-14
Burbank$88.40 inspection fee per water heater; the schedule says the plumbing permit fee is the plan check fee and the filing fee plus these inspection feesCitywide Fee Schedule, FY 2026-272026-11-14
Concord$192 fixed inspection fee for a residential water heater replacement, plus an administrative fee ($70 base plus 0.0789% of valuation, $550 maximum), and a technology fee of 10.5% of the administrative, plan review and inspection feesBuilding Division Fees (T3a), Res. No. 26.6042.12026-11-14
Fremont$133 flat for "Water heater or softener addition/replacement, residential only, with one or more fixture" as an express permit (inspection only, no plan review)Master Fee Resolution No. 8672, effective July 1, 2026 (p. 21)2026-11-14
Fresno$111.50 for a simple mechanical, plumbing or electrical permit, which covers any item or combination on its lists, water heaters included, plus a $27.08 permit issuance feeMaster Fee Schedule, effective July 1, 20262026-11-14
Glendale$106 per water heater and/or vent in a single-family homeFY 2026-27 Citywide Fee Schedule (p. 57; line effective August 22, 2026)2026-11-14
Hayward$113 each for "Water Heater/Gas"; $227 each for a heat pump water heater (single-family and duplex); the schedule says administrative fees are added to flat-rate permitsFY 2026-27 Master Fee Schedule, effective July 1, 20262026-11-14
Huntington Beach$50 per water heater and/or vent; $49 minimum plumbing permit fee; $1 record retention fee per issued permitMaster Fee and Charges Schedule, effective July 1, 2026 (fee column headed "Proposed Fee")2026-11-14
Irvine$40.19 per water heater and/or vent or thermal expansion tank, plus a $31.88 permit issuance fee (residential); $63.77 minimum inspection feeCommunity Development and Public Works Fee Schedule, effective August 15, 2026 (Schedule V)2026-11-14
Long BeachNot established: the plumbing schedule has a $104 issuance fee per permit but no water heater itemPlumbing Permit & Plan Review Fees, effective October 1, 20262026-11-14
Los Angeles$28 per water heater and vent; $55 minimum when the permit is for one item costing less than $55; a 3% One-Stop surcharge and a 6% Systems surcharge ($1 minimum each) on the subtotal after any permit issuing fee. The form LADBS links is dated July 2017LADBS Plumbing Permit Fee Schedule2026-11-14
Los Angeles County (unincorporated)$24.47 per water heater and/or vent, plus $41.35 for issuing each permitPlumbing Code Fee Schedule, effective July 1, 20262026-11-14
Mission Viejo$75 per water heater and/or vent, plus a $25 plumbing permit issuance feeBuilding Fees, effective April 1, 20232026-11-14
Mountain View$14.20 per water heater, not including gas lines or vents, plus a $77 permit issuance feeBuilding Permit Fees, effective August 22, 20262026-11-14
Newport Beach$40 per water heater and/or vent, plus a $45 permit issuance feeSchedule of Rents, Fines and Fees FY 2026-27 (building fees effective July 25, 2026)2026-11-14
Oakland$201.48 each for a water heater (gas or electric) and/or storage tank, listed under inspection of water pipingFY 2026-27 Master Fee Schedule, effective July 1, 2026 (Planning & Building, O-4)2026-11-14
Palo Alto$343 per permit for water heaters in a single-family home, duplex or condominium unitFY 2027 Adopted Municipal Fee Schedule, Building Fees (p. 69)2026-11-14
Pasadena$40 per water heater, vent included, plus a $78 permit processing fee for mechanical, plumbing and electrical permitsFY 2027 General Fee Schedule (adopted column, June 8, 2026)2026-11-14
Pleasanton$120 fixed residential plumbing permit fee (plumbing work in a one- or two-family home, not tied to a building permit), plus a 5% technology fee on all permitsBuilding Permit and Plan Review Fees, January 1, 20262026-11-14
Sacramento$75 flat building permit fee for a water heater (new installation, replacement or move), no plan review fee; plus a technology surcharge of 10% of the building permit fee, a general plan fee of $2.60 per $1,000 of valuation (capped at $38,200 above $14.85 million) and a green building fee; a city operations tax applies when a California licensed contractor holds the permitBuilding Permit Fee Table B.1, effective July 19, 2025, from the city's fee database; parts listed on its water heater fees page2026-11-14
San Diego$122.97 per water heater (Table 3B); a single-family home, duplex or townhouse qualifies for a Simple PermitInformation Bulletin 103, May 20262026-11-14
San FranciscoNot established: Table 1A-C prices plumbing permits by category and no category names a water heater. Category 1P (single residential unit; a single plumbing fixture, among others; up to two inspections) is $290, and installations not covered by a category are billed at $519 an hour; the table doesn't say which appliesTable 1A-C, permits issued on and after July 12, 20262026-11-14
San Jose$315 an hour of actual inspection time or the itemized amount, whichever is greater, with a 30-minute minimum per item; the minimum permit issuance fee for a water heater replacement through Online Permits is $0Building Division Fee Schedule FY 2026-27, effective August 10, 2026 (pp. 6, 9)2026-11-14
San Ramon$160 per water heater (heat pump water heaters also $160 each); $160 minimum plumbing permit fee; $89 permit issuance fee per permit; technology surcharge of 4.60% of the permit feeFee Resolution, FY 2026-27 column2026-11-14
Santa Ana$29.45 per residential water heater up to 50 gallons ($120.82 over 50 gallons, $86.79 tankless), plus a $72.86 plumbing permit issuance feeMiscellaneous Fees Schedule FY 2026-27, effective July 1, 20262026-11-14
Santa Clara$244 for a water heater in the same location (like for like; $325 for a new tankless water heater), plus the $101 permit issuance fee and a technology fee of 3.37% of applicable feesFY 2026/27 Municipal Fee Schedule, adopted April 21, 20262026-11-14
Santa MonicaNo water heater line. A residential single-trade permit (per dwelling unit, up to three inspections) is $444.65; the schedule cuts residential single-trade fees by 50% and adds a fee of 13% of the permit for keeping permit documentsFees and Rates, FY 2026-272026-11-14
SunnyvaleNo water heater line. A residential plumbing permit is $0.15 per square foot with a $130 minimum, plus a $42.50 permit issuance fee and a technology surcharge of 5% of the permit feeFY 2026-27 Building Permit Fees, effective August 18, 20262026-11-14
Tustin$123.01 per water heater and/or vent, plus a $38 plumbing permit issuance feeComprehensive Schedule of Fees, effective April 1, 20262026-11-14
Walnut Creek$127 or 1.27% of the total contract cost, whichever is greater, for a plumbing, electrical or mechanical permit that needs no building permitMaster Fee Schedule FY 2026 & FY 2027 (p. 33)2026-11-14

Fee schedules change, often each July 1, and several cities adjust fees by the Consumer Price Index. The "read on" date is when we last opened each schedule; read the city's current schedule before you quote. For each city's portal, forms and contacts, see its city permit guide.

From January 1, 2027, state law caps the permit fee for a heat pump water heater in an existing home at the city's estimated reasonable cost and no more than $150, unless the city adopts a higher, fixed and publicly listed fee by resolution or ordinance backed by a written finding with substantial evidence of its cost. Cities with fewer than 5,000 people, and counties with fewer than 150,000 along with every city in them, are exempt (Gov. Code §51297.57, added by SB 222). The Hayward and San Ramon heat pump fees in the table were read on November 14, 2026, before the cap applies. See California permit laws taking effect 2027 to 2028.

The state fees on top

Two state fees are figured from the job's valuation and ride on building permits: the Strong Motion Instrumentation Program (SMIP) fee and a building standards fee charged per $25,000 of valuation. Whether a city adds them to a stand-alone plumbing permit varies, and few schedules say. The three below do; the dollar figures are theirs.

  • Concord applies its SMIP fee to all permit applications, citing Public Resources Code §§2700–2709.1 (Building Division Fees, T3a).
  • Sacramento lists a green building fee, a general plan fee and a technology fee as due on every residential or commercial water heater permit, and a city operations tax when a California licensed contractor holds the permit (water heater fees page). Its fee database ties the green building fee to Health and Safety Code §18931.6 and charges $1.00 on a valuation of $1 to $25,000 (Green Building Fee table).
  • Pleasanton requires SMIP and the state building standards (CBSC) fee on building permits: residential SMIP is $0.13 per $1,000 of valuation ($0.50 minimum), and the CBSC fee is $1 per $25,000 of valuation or fraction. It also says plumbing, electrical or mechanical work without a building alteration, such as a water heater replacement, is typically not subject to additional permit surcharges (Building Permit and Plan Review Fees).

Why the city fee differs

Each city sets its fees to recover its own cost of the service, and counts that cost its own way. Government Code §66014, read November 14, 2026, says fees for building permits and building inspections may not exceed the estimated reasonable cost of providing the service, unless two-thirds of the voters approve a higher fee. It sets a ceiling, not a statewide price.

Before you quote the permit line

Your own time depends on the city's process and your crew; price it at your own rates. The city's schedule covers only the fee.

  • Open the city's current fee schedule, not last year's, and find the line for the work: water heater, tankless, heat pump.
  • Note the issuance, processing, technology or records fees the schedule adds, and any minimum fee.
  • Check whether the schedule wants the job's valuation or contract price for a percentage fee.
  • Add your preparation and filing time, and a trip and a wait for each inspection the permit includes.
  • Know the city's re-inspection fee before you price the risk of a failed inspection.
  • Decide who pulls the permit before you quote it. If the customer pulls it as an owner-builder, read which license can pull which permit first.

For the permit scope on this job, see the water heater replacement guide; for what skipping the permit costs a contractor, see Skipping the permit.

FAQs

How much is a water heater permit in California?

Each city sets its own fee, and the 31 California fee schedules read on November 14, 2026 price it in several different ways. Some charge one flat permit fee (Palo Alto lists $343 per permit for a single-family home), some a per-heater fee plus an issuance fee (Mountain View lists $14.20 per heater plus a $77 issuance fee), and some bill inspection time or a share of the contract price. Two of the 31 schedules name no water heater item and don't make clear which of their fees applies. Read the fee from the city's own schedule.

Does a failed inspection cost extra?

In many cities, yes. Mountain View's schedule charges $437 per reinspection when the job isn't ready or nobody shows up; San Francisco charges $259 per half hour for a re-inspection; Huntington Beach lists a $208 reinspection fee; Santa Monica charges $183 on a residential single-trade permit; San Jose bills re-inspection at $315 an hour with a 30-minute minimum. Each figure is from that city's current schedule.

Are there state fees on a water heater permit?

Two state fees ride on building permits, both figured from the job's valuation: the Strong Motion Instrumentation Program (SMIP) fee and the building standards fee, which Pleasanton states as $1 per $25,000 of valuation or fraction thereof. Whether a city adds them to a stand-alone plumbing permit varies. Sacramento lists a green building fee, which its fee database ties to Health and Safety Code §18931.6, as due on every water heater permit; Pleasanton says plumbing-only work such as a water heater replacement is typically not subject to additional permit surcharges.

Why do permit fees differ so much between cities?

Each city sets fees to recover its own cost of the service. California Government Code §66014 says fees for building permits and building inspections may not exceed the estimated reasonable cost of providing the service, unless two-thirds of voters approve more. Cities count that cost differently, so the same job gets a flat fee in one city and an itemized or hourly fee in the next.

Should I average these fees to quote a job in a new city?

No. The schedules don't price the same thing: one fee includes issuance and two inspections, another is a per-heater line that sits on top of an issuance fee and a technology fee. An average of unlike numbers matches no city. Look up the city where the job is, read its line for the work, and add the city's own add-ons.