Guide · Express permits
Express, over-the-counter and same-day permits in 31 California jurisdictions
Whether 31 California building departments say they issue a water heater, panel upgrade, reroof or HVAC changeout permit on payment, over the counter, the same day or without plan review. Every cell links the jurisdiction's own page and quotes it; cells without evidence read "not established".

On this page
Some California building departments issue the permit for a small job the moment you pay; others review every application first. For four common small jobs (a water heater replacement, an electrical panel upgrade, a reroof and an HVAC changeout, all in a single-family home), the table shows what each of the 31 California jurisdictions GetPermit covers says about issuing the permit. Every filled cell links the jurisdiction's own page or bulletin, read on November 15, 2026, and the source notes quote it. This is not legal advice.
What "express", "over the counter" and "same day" mean
Each building department picks its own words, and the same word can mean different things. Mountain View's Same-Day Permits are issued online without plans; Walnut Creek uses "over-the-counter" for permits typically reviewed within 3 to 5 business days. Applying online is not the same as getting the permit the same day, so the table records what each jurisdiction says about issuance, in its own terms.
The cells use the jurisdiction's own name for the route and its own words on timing:
- Issued on payment, online. The jurisdiction says the permit is issued when you pay, automatically, instantly or in real time.
- Same day. The jurisdiction says the permit is issued the same day, online or at the counter.
- Express, Simple, minor or Tier 1 permit, no plan check. A named route for work that needs no plans or plan review. Where the jurisdiction states a turnaround (one to two business days, or "same day or next business day"), the cell gives it.
- Over the counter. The jurisdiction's own term. It does not always mean the same visit.
- Review. The jurisdiction says the job goes through review or plan check, with the timing it states.
- Not established. We found no page from the jurisdiction that names the job and says how its permit is issued. The catalog's record of how a city accepts applications was not used: an online portal does not prove same-day issuance or that a job qualifies.
The job in each column is the one most contractors mean: a like-for-like water heater replacement; an electrical panel or service upgrade; a reroof with no structural work; and a furnace, air conditioner or heat pump changeout. Most routes come with limits (same location, an amperage cap, a roof weight, single-family only, licensed contractors only); the cell names the main one and the source notes give the rest.
Four small jobs in 31 California jurisdictions
Each filled cell links its source. The table doesn't rank jurisdictions.
City programs change often, and several of the pages above call theirs a pilot or describe it as new. The "read on" date is when we last opened each source; check the jurisdiction's current page before you count on a route. For each jurisdiction's portal, forms and contacts, see its city permit guide.
Source notes by jurisdiction
All sources were read on November 15, 2026.
Anaheim
- All four cells are not established. Anaheim's panel upgrade page says the electrical permit "can be obtained online", with nothing on review or timing. Its permit processing page says smaller projects needing no more than 30 minutes of plan review can typically be reviewed over the counter, and names no job.
Berkeley
- All four cells are not established. Berkeley's walk-in services list takes residential electrical, mechanical, plumbing and reroof permits at the counter but doesn't say they are issued there. Its plan check page lists the projects reviewed over the counter, and none of the four jobs is on it.
Burbank
- All four jobs: the building permits page defines "Tier 1: Simple Permits for repair and maintenance type of work that do not require plan check" and says "Tier 1 permits can generally be obtained over the counter." Some Tier 1 permits for single-family homes are available online; its examples include water heaters, "Electrical panelboards", reroofing and "HVAC changeout".
Concord
- Water heater, panel and HVAC: the Miscellaneous Mechanical, Electrical, or Plumbing instructions cover basic work that does "not require plans or calculations", one scope per permit, and list "Residential Water Heater Replacement", "Residential Electrical Service Replacement", and residential AC, furnace and HVAC replacement. After payment, "your permit has been issued." A contractor applying needs a City of Concord business license number on file; an owner can apply as owner-builder. The wording is service replacement; it doesn't say whether a larger service counts.
- Reroof: the Reroof Permits instructions cover "all types of reroofing projects", overlays and tear-offs included, with any required Title 24 energy documents attached; the permit is issued on the payment confirmation screen.
Fremont
- All four jobs: the permit types page says express permits "can be applied for online through Citizen Access and are issued automatically." Its express types are Residential Plumbing (an existing water heater, tank, tankless or heat pump, "in the same location"), Residential Electrical ("a main service electrical panel"), Reroof (more than 100 square feet of roofing replaced) and Residential HVAC (a furnace, wall heater, A/C or mini-duct split system installed or replaced in the same location).
Fresno
- All four jobs: Fresno's Building and Safety booklet, dated 2023, puts "Electrical-Main Panels", heating, ventilation and air conditioning, "Plumbing-Water Heater, & Re-Roofs" in Level 1, with a completeness review of 2 to 3 business days and a review timeline of up to 3 business days. Its Building and Safety page also lists "Same day express permits for Electrical, Mechanical, & Plumbing" among in-person services, without naming jobs.
Glendale
- All four cells are not established. Glendale's permit application guidance links each permit type to its portal with no word on review or timing, and its FAQ describes express plan check for commercial projects.
Hayward
- All four cells are not established. A small-business page says minor permits, re-roofing and water heater replacement among them, "are frequently issued over the counter", but its reroofing requirements (revised December 2, 2022) say digital submittals only, and its e-Permits help center says staff check an application is complete within five business days. The newer, job-specific sheet and the general one disagree, so we didn't fill the cells from the older sentence.
Huntington Beach
- All four jobs: the express permitting page says "Express Permits are simple, single-family residential permits that do not require a plan review", submitted online, and that you "receive the permit same day or next business day." The flyer on the page lists water heater, "Main Service Panel (400 amp or less)", re-roof, furnace, air conditioning and mini-splits.
- Reroof: the page adds "Re-roof permits are now automatically issued after payment." For furnace and air conditioning units, include the CF1R form with the submittal.
Irvine
- All four jobs: the same-day permits page says PermitsDIRECT! "automatically checks for code compliance and issues permits in real time", and that licensed contractors and homeowners can apply. Its eligible types include "Residential Water Heater", "Electrical Panel Upgrades", "Residential Reroof" and "Residential HVAC Changeout". It states no amperage or like-for-like limit.
Long Beach
- All four jobs: Information Bulletin IB-058 (revised July 9, 2025) defines an Express Permit as one that does not require construction documents, except in a Coastal Zone, a historic district or on a qualified historical building. Its items: replace a water heater in the same location with the same size and type (200,000 Btu/h maximum); alter, upgrade or replace a one- or two-family service, "maximum of 200A permitted", with the same number of wires, phase and location, one service drop per building and no change in connected load; re-roof with composition shingles of 6 psf or less, or built-up Class A or B roofing, each over solid sheathing or over at most one existing layer of the same material installed over solid sheathing; replace HVAC units with the same size and type, where the "Total aggregate btu/hr of all units shall not exceed 33,000 btu/hr"; and install or replace a single-unit gas heater or vented gas furnace.
- How issued: the express permits page says they "can be obtained by visiting our Permit Center and in some cases, online." The online permitting page offers water heater changeouts, electrical panel changeouts and reroofs of one- and two-family dwellings through its customer portal, where "applicants can apply for and be automatically issued a permit in one step"; the same steps say payment follows once the application is approved, and the permit is emailed. Owners' or contractors' agents attach a letter of authorization or a permit proxy form. HVAC isn't on that list; online mechanical permits are for registered contractors with a city-issued PIN.
Los Angeles
- All four jobs: LADBS Information Bulletin P/GI 2026-003, "Express Permits (No Plan Check Required)" (effective January 1, 2026, revised June 10, 2026), lists "Replacing water heaters"; electrical installations under 600 volts and "up to 400 amps total load" in existing residential buildings, non-engineered wiring only; re-roofing with Class A or B covering "weighing less than 6 pounds per sq. ft." over solid sheathing, Class A in a Very High Fire Hazard Severity Zone and a CRRC-rated cool roof product when more than half of a residential roof is replaced; "Replacing A/C units with same size & type"; and gas furnaces under 500,000 Btu/h. Express Permits are obtained online or by appointment at the LADBS counters.
- Timing: LADBS's FAQ says Express Permits "can be issued on the same day" and that obtaining a permit online "takes only minutes". The Los Angeles hub has the details: Express permits in Los Angeles.
Los Angeles County (unincorporated)
- Water heater: the County's contractor page gives a residential water heater replacement as an example of a permit with "No plan check required". Since August 26, 2026, its express permit types guide says, the express electrical, mechanical and plumbing permits are no longer available; apply for the "Simple" permit. The Simple permit guide says these "do not need plan review" but are reviewed by staff before the invoice is sent. The County's older express permits page still describes self-issued permits.
- Panel: the electrical plan check page requires plan check for equipment rated 400 amps or more, except 400-amp, 120/240-volt, single-phase, three-wire services for single-family homes.
- Reroof: not established; no County page we found says how a reroof permit is processed.
- HVAC: the County's Residential A2L Plan Check Determination Form requires mechanical plan check for new or replacement HVAC systems using an A2L refrigerant unless one of its three exceptions applies, such as a charge at or under its Table 1 limit.
Mission Viejo
- All four cells are not established. The Client Self Service page lists panel, reroof and HVAC permit types with their required attachments, but says nothing about review or timing.
Mountain View
- All four jobs: the Same-Day Building Permits page says these "can be submitted and issued online without a set of building plans for single-family homes and duplexes only." Its items: water heater replacement in the same location, 30 to 150 gallons; electrical service panel upgrade in the same general location, 200 amps for a single-family home, with no other electrical work; reroofing, unless the new material exceeds 7.5 pounds per square foot, the roof is part of a remodel or addition, or the work changes the roof framing or adds skylights; furnace replacement in the same location, and air conditioning and heat pump HVAC units.
Newport Beach
- All four jobs: the online permitting page describes Express Permits for single-family and duplex single-scope projects such as "replacing a furnace" or "replacing your roofing". The Residential Express Permits flyer (effective May 1, 2025) lists "Gas Water Heater", "Upgrade Electrical Panel (400 Amp Max)", "Gas Heaters or Furnace" and "Reroof". No air conditioner or heat pump item is listed. Neither says how fast an express permit issues.
- Reroof: the express reroof sheet (updated January 8, 2026) requires a one- or two-family dwelling, new roofing of 6 lb per square foot or less, and only one existing layer recovered; otherwise "the express permit cannot be obtained".
Oakland
- Water heater, panel and HVAC: the permit processing turnaround page lists, under building permits with no plans and no planning review, "Mechanical, Electrical or Plumbing Permits (MEPs) - Water heater replacement, main service upgrade, furnace replacements etc." at "Same Day" by online application. The page says its timelines are general guidance, not exact.
- Reroof: re-roofing uses a Re-Roofing Certificate: the owner, or a contractor licensed for the work with a current Business Tax Certificate, applies online and self-certifies the work. The turnaround page lists certificates at up to 5 days.
Palo Alto
- Water heater, reroof and HVAC: the Apply for a Building Permit page says an Instant Building Permit "is limited to Licensed Contractors with an active Accela Citizen Access (ACA) account." Its list: one gas water heater, not tankless, same BTUs or less and under 200,000 BTUs, or one heat pump water heater; a like-for-like re-roof, one structure per permit, on a non-historic detached single-family home or duplex; a furnace replacement in the same location with no A/C or heat pump; and heat pump space conditioning systems.
- Panel: the Over-the-Counter Residential MEP Permit Pilot Program covers "Electrical Service Replacements up to 225 Amps". A coordinator checks the pre-application within 1 business day and schedules an appointment; "If the documents are approved, the coordinator will issue the permit the same day." The checklist link on the apply page says 200 amps.
Pasadena
- Water heater, reroof and HVAC: the Express Permit Portal offers residential express permits for HVAC, for plumbing "including water heaters", and for reroofing. The Permit Center Online page says mechanical, electrical and plumbing permits can be obtained "within minutes" there.
- Panel: the portal's electrical express permit names no job. The apply page says "In some cases, plans are not necessary for some work (e.g., upgrading electrical service, replacing a water heater)."
Pleasanton
- All four cells are not established. The electronic submittal handout (January 2026) puts water heaters, HVAC and panel upgrades in a "Simple Permits" category, separate from over-the-counter and standard plan check, but doesn't say how they are issued; the processing time it states, approximately 3 to 5 business days, is for all applications. Reroofing is a residential alteration with no stated category.
Sacramento
- All four jobs: the Minor Permits page says "A minor permit is a permit for which no construction plans are required. All review for code compliance is performed in the field." Its list includes water heaters, "Main and sub service panels", "Residential and Commercial Re-Roofs", and residential HVAC for "One and two family dwelling units only". California licensed contractors can get these online through the Public Permit Portal; homeowners can pull the reroof, HVAC and water heater ones online for a single-family home or duplex. The page doesn't say how fast they issue.
San Diego
- Water heater and HVAC: the Simple Permits page describes a no-plan mechanical, electrical and plumbing permit for single-dwelling units, duplexes and townhouses outside historic districts and not on individually designated historic properties. It covers "Water heater replacements, except tankless types" and "Replacement of furnaces" and A/C units. "Licensed contractors will receive the permit as soon as they complete and submit the application and pay the invoice"; homeowners normally within two business days. IB 103 requires a building permit and plans when the floor, roof or platform supporting the equipment must be altered, or when it sits on a new pad on grade outside the building's footprint.
- Panel: Information Bulletin 103 (May 2026) marks "Panel Replace/Upgrade up to 200 amp" as qualifying for a Simple Permit in a single-family home, duplex or townhouse.
- Reroof: the permits FAQ says "Reroofs do not qualify for No-Plan Permits, as most are exempt from permits. Plans are required for reroofing projects that require a permit."
San Francisco
- Panel: the electrical permit page covers electrical work "without plans", services and subpanels included, and says a contractor "authorized for Express Permits on PermitSF" can "skip City staff review and pay for your permit right away." It states no amperage limit and doesn't itemize which service work is express-eligible.
- Reroof: the reroofing permit page issues online only for work that needs no plans and replaces no structural components, applied for by a C-39 contractor. To get it "right away" on a non-historic residential building, the contractor must be on a contractor authorization record "at least two business days in advance". Structural reroofs take an over-the-counter permit with plans.
- Water heater and HVAC: not established. The plumbing and mechanical permit page offers a no-plans permit with the same express skip-review, but no page we found names a water heater or an HVAC changeout for it.
San Jose
- All four jobs: the Online Building Permits page says "You can download a building permit for 56 types of simple projects at SJPermits.org" and that most need no plans; only property owners and qualified contractors may apply. For a single-family home or duplex it lists Water Heaters, Reroof, "Service Change/Survey up to 400 Amps" ("Only like-for-like replacements in the same location, with no alterations to exterior finishes"), Furnace Replacement, Air Conditioning and heat pump HVAC.
- How issued: the water heaters page (updated April 14, 2026) says SJPermits presents the fee, and "After payment, you will be able to download the Permit Card."
San Ramon
- All four cells are not established. San Ramon's building permit review page says processing typically takes 5 to 10 business days and that an application needing no review is processed for issuance, but no page names the jobs that need none.
Santa Ana
- All four jobs: the PBx Same Day Express Permit page says "Permits for residential and commercial projects that do not require plan check are issued as Same Day Express Permits", at the permit counters and online. Under "Residential – Replacements Only" it lists Water Heater, "Service Meter 0-399 amps", "Reroof (like-for-like)", furnaces, mini-splits and fan coils. An air conditioner condenser or heat pump isn't named, and a service upgrade isn't clearly a replacement. Historic properties and the SD-19 and SD-40 zoning districts don't qualify.
Santa Clara
- Water heater, reroof and HVAC: the Simple Permits page (last updated September 17, 2025) says "you can typically receive approval for your building permit within 1-2 business days." It covers like-for-like water heater replacements; roofing replacements "excluding structural work"; and like-for-like furnace, air conditioner and ductwork replacements, for single-family homes, duplexes and ADUs only, not in historic areas, with open code enforcement cases or with other parcel conditions.
- Panel: not established; the Simple Permits list has no electrical item.
Santa Monica
- All four jobs: Information Bulletin IB-2023-01, "Express Permits (No Plan Review Required)" (revised April 22, 2024), lets single-family property owners do qualifying work "without any plan review." Its items: "Replace water heaters at the same location within same footprint/closet"; electrical services and panelboards "up to 400 amps total load" in an existing single-unit home; re-roof with Class A or B covering under 6 pounds per square foot over solid sheathing, with a CRRC-rated cool roof product when more than half the roof is replaced; and "Replace A/C units with same size, location, and type". The only heating item is a wall heater; a furnace isn't listed.
- How issued: the Express Permit how-to page says qualifying projects "may be issued a building permit entirely online within a matter of a couple of days"; staff verification "typically takes up to two business days."
Sunnyvale
- All four cells are not established. Sunnyvale's online services help links a guide to applying for a Minor Building Permit, but the guide is a PDF we could not open, so nothing from it is used here.
Tustin
- Water heater and HVAC: Tustin's user guide for water heaters, furnaces and air conditioners, dated June 1999 and still posted, says these permits "may be issued on an over the counter basis."
- Reroof: its reroofing user guide (revised August 2013) says permits "are usually issued over the counter"; replacing roofing with material of 7 psf or more needs calculations and roof framing plans from a licensed architect or engineer.
- Panel: not established. Tustin's current permits process page sends applications through its online portal; check the counter route there before you rely on the older guides.
Walnut Creek
- Water heater and HVAC: the building permit FAQ says "We no longer accept permit applications nor issue permits in person" and that its over-the-counter permits, with "water heater/furnace replacements" among the examples, are "typically reviewed within 3–5 business days".
- Panel and reroof: not established; the FAQ's examples name electrical work in general but no panel, and no reroof.
The limits on the fast route
Limits the sources state:
- Same location, same type. Long Beach, Mountain View, Santa Monica and Fremont tie the water heater or HVAC route to replacement in the same location, and San Jose its service change; Long Beach and Los Angeles add the same size and type.
- Amperage. San Jose, Santa Monica, Newport Beach and Huntington Beach stop at 400 amps, and Los Angeles at 400 amps total load; Palo Alto's pilot at 225; Mountain View, San Diego and Long Beach at 200.
- Roof weight. Los Angeles and Santa Monica take roof covering under 6 pounds per square foot, Long Beach and Newport Beach 6 or less, and Mountain View up to 7.5. Structural work takes a reroof out of the fast route in San Francisco, Santa Clara and Mountain View.
- Who applies. Palo Alto's instant permits are for licensed contractors only, and Long Beach's online mechanical permits for contractors with a city-issued PIN; San Francisco's right-away reroof needs a contractor authorization filed two business days ahead; San Diego issues at once to licensed contractors and in about two business days to homeowners.
- Refrigerant and energy rules. Los Angeles County requires plan check for many A2L-refrigerant HVAC systems. Huntington Beach wants a CF1R with furnace and air conditioning submittals, and a changeout can still need HERS (ECC-Rater) verification; see CF1R, CF2R, CF3R and the HERS rater.
Before you count on a same-day permit
A fast permit still needs inspections, so plan the visit too.
- Find the jurisdiction's express, Simple, minor or over-the-counter list and confirm it names the job.
- Check the limits: same location, like-for-like, amperage, roof weight, single-family only, historic status.
- Check who may apply online: some routes are for licensed contractors only, some need a city business license or a pre-registered account.
- Read how the permit issues: on payment, after staff verification, or at an appointment.
- Keep one scope per permit where the jurisdiction asks for it; a combined scope can send the job to plan review.
- For an HVAC changeout, check the refrigerant rules and whether the job needs ECC-Rater verification.
- Decide who pulls the permit. If the customer pulls it as an owner-builder, read which license can pull which permit first.
For what the permit costs once you have the route, see Pricing the permit on a small job; for how long reviewed permits take and the statutory clocks, see How long a California building permit takes. For the permit scope of each job, see the guides for a water heater replacement, a panel upgrade, a reroof, an AC changeout and a furnace replacement.
FAQs
What is an express permit in California?
There is no statewide definition; each building department uses its own term. The Los Angeles Department of Building and Safety defines it as a permit that does not require plans or plan check. Huntington Beach calls its Express Permits simple single-family permits that do not require a plan review. Other jurisdictions use Simple Permit, Same-Day Permit, minor permit or instant permit for a similar route, each with its own list of jobs and limits.
Can I get a water heater permit the same day?
In some California jurisdictions, yes. Mountain View lists water heater replacement among its Same-Day Permits, issued online without plans; Santa Ana lists it under its Same Day Express Permits; San Jose lets you download the permit card after you pay online. Others review it first: Walnut Creek says its over-the-counter permits, water heaters included, are typically reviewed within 3 to 5 business days. Check the jurisdiction's own page before you promise a start date.
Does applying online mean the permit is issued the same day?
No. Walnut Creek takes every permit through its online portal and says the simple ones are typically reviewed within 3 to 5 business days. Santa Monica's Express Permits need no plan review, but staff verify eligibility, which typically takes up to two business days. Los Angeles County moved its trade permits to a Simple permit that staff review before issuing, effective August 26, 2026. Read what the jurisdiction says about issuance, not just where you apply.
Does a panel upgrade qualify for an express permit?
Often, up to an amperage the jurisdiction sets. San Jose's online permit covers a service change up to 400 amps, like-for-like in the same location; Santa Monica's Express Permit covers services up to 400 amps in an existing single-unit home; Mountain View's Same-Day Permit covers a new panel of 200 amps for a single-family home; San Diego's Simple Permit covers a panel replacement or upgrade up to 200 amps; Long Beach's Express Permit allows a maximum of 200 amps, with the same number of wires, phase and location and no change in connected load. For a larger service, check the jurisdiction's route before you file.
What does "not established" mean in the table?
It means that on November 15, 2026 we found no page or document from that jurisdiction that names the job and says how its permit is issued: online on payment, over the counter, the same day, through a named express or no-plan-review program, or after plan review. It does not mean the jurisdiction has no fast route for the job. Ask the building department, or look in its permit portal.