Garage conversion permits in California
Last updated November 15, 2026

General California guidance for ADU contractors. Each city sets its own fees, forms, and timelines.
Do you need a permit?
Yes. Converting a garage into living space in California always needs a building permit (2025 California Residential Code §R105.1). The path decides the rest: an ADU or a JADU is approved under state ADU law (Gov. Code §66310 et seq.), with ministerial review, a 60-day decision clock on a complete application when the lot already has a house (paused for any delay the applicant requests), and no replacement parking for an ADU, while a bedroom or family room is an ordinary alteration under local zoning. A B (General Building) contractor generally takes the job.
How garage conversion permits work in California
A garage conversion turns unconditioned, non-habitable space into living space, so it always needs a building permit, and usually electrical, plumbing and mechanical scope with it. What changes from job to job is the legal path. Converting into an accessory dwelling unit (ADU) or a junior accessory dwelling unit (JADU) runs under state ADU law, Government Code §66310 et seq., which limits what the city can require on parking, setbacks and fees and puts deadlines on its review. Converting into a bedroom, office or family room is an ordinary alteration, and local zoning decides those questions. The building code and the Energy Code apply on every path. Every rule below was read on November 15, 2026, from the codified text on leginfo and the 2025 California Residential Code and Energy Code on ICC. Fees, submittal format and inspection scheduling are set by each city or county, so confirm them with the building department.
Three ways to convert a garage, compared
The ADU and JADU columns are state law; a city may adopt less restrictive rules (Gov. Code §§66325, 66339.5). The third column is what's left when ADU law doesn't apply.
| ADU | JADU | Habitable space, not a unit | |
|---|---|---|---|
| What it is | A complete independent unit: permanent provisions for living, sleeping, eating, cooking and sanitation (§66313(a)) | Up to 500 sq ft of interior livable space, entirely within a single-family residence; its own bathroom or a shared one (§66313(d)) | A bedroom, office or family room added to the house |
| Which garage | Attached or detached (§66314(d)(3)) | Attached only: an attached garage counts as part of the house (§66333(d)) | Local zoning |
| Approval | Ministerial, no hearing. Completeness notice within 15 business days; approve or deny within 60 days of a complete application when the lot already has a house, or it is deemed approved; a delay the applicant requests pauses the clock (§66317(a)) | Ministerial, no hearing. Completeness notice within 15 business days; approve or deny within 60 days of a complete application when the lot already has a house; a delay the applicant requests pauses the clock (§66335(a)) | The city's ordinary building permit review |
| Garage parking | The lost spaces need not be replaced (§66314(d)(11)), and no parking standard applies to an ADU inside the house or an accessory structure (§66322(a)(3)) | No additional parking as a condition of the permit (§66334(a)) | Local zoning |
| Setbacks | None for an existing accessory structure converted in place, or rebuilt in the same location and dimensions (§66314(d)(7)) | Stays within the house's walls (§66333(d)) | Local zoning |
| Utility connections | A conversion that qualifies under §66323(a)(1) (within existing space): no new or separate connection and no related connection fee or capacity charge, unless the unit was built with a new single-family home or is sold separately under §66342 (§66311.5(d)) | Not a separate or new dwelling unit for water, sewer or power service, including connection fees (§66338(a)) | The utility's ordinary rules |
| Impact fees | None at 750 sq ft of interior livable space or less (§66311.5(c)(1)) | None at 500 sq ft or less (§66311.5(c)(1)) | Local rules |
| Fire sprinklers | Not required if the house doesn't need them, and the ADU doesn't trigger them in the house (§66314(d)(12); 2025 CRC §R309.2, Exception 2) | Not a separate or new dwelling unit for any fire or life protection rule (§66337(a)) | Not required for an alteration to a house without sprinklers (CRC §R309.2, Exception 1) |
| Owner-occupancy | Can't be required on a single-family lot (§66315) | Required only when the JADU shares a bathroom with the house, and not when the owner is a governmental agency, land trust or housing organization; a deed restriction is recorded (§66333(b), (c)) | Not applicable |
Garage conversion to an ADU
A conversion that stays inside the garage's existing space gets the strongest protection in ADU law. In a residential or mixed-use zone, the city must approve it ministerially, and it may not impose any objective development or design standard that §66323 doesn't authorize (§66323(a)(1), (b)). The conditions:
- One ADU and one JADU per lot with a proposed or existing single-family dwelling (§66323(a)(1)).
- Within existing space of the house or an accessory structure such as the garage. The ADU may expand up to 150 square feet beyond the accessory structure's existing dimensions, and only to accommodate ingress and egress (§66323(a)(1)(A)).
- Exterior access from the house, and side and rear setbacks sufficient for fire and safety (§66323(a)(1)(B), (C)).
- Rentals must be for terms longer than 30 days (§66323(e)).
What else the statutes settle for a contractor:
- Existing problems on the lot. The city may not make correcting nonconforming zoning conditions a condition of ministerial approval (§66323(c)). It may not deny the ADU over nonconforming zoning conditions, building code violations or unpermitted structures that don't threaten public health and safety and aren't affected by the ADU (§66322(b)). And it may not require a violation on the main house to be corrected as a condition, unless correcting it is necessary to protect health and safety (Health and Safety Code §17980.12(a)(3)).
- Occupancy. Building an ADU is not a Group R occupancy change under the local building code unless the building official or enforcement agency makes a written finding, based on substantial evidence in the record, that it could have a specific, adverse impact on public health and safety. The same paragraph lets the city change the occupancy code of a space that "was uninhabitable space or was only permitted for nonresidential use" and was converted to residential use (§66314(d)(8)). Plan the converted garage to the code for a dwelling.
- An attached ADU is a second dwelling unit in the building. The 2025 CRC separates the dwelling units of a two-family dwelling with 1-hour fire-resistance-rated assemblies, or ½-hour where the building is sprinklered throughout (§R302.3). Confirm the separation detail with the building department. A JADU is not a separate dwelling unit for fire and life protection rules (§66337(a)).
- Incomplete or denied. A notice of incompleteness lists what's missing and how to fix it, and the resubmittal can't be asked for anything not on that list. A denial comes with a full set of written comments. Both can be appealed in writing, with a final written decision within 60 business days (§66317(a)(2), (b), (d)).
- Tearing down a detached garage instead. The demolition permit is reviewed with the ADU application and issued at the same time, with no notice or placard unless the property is within an architecturally and historically significant historic district (§66314(e), (f)).
- Impact fees from January 1, 2027. SB 1117 (Chapter 809, Statutes of 2026) limits impact fees on an ADU over 750 square feet to the area above 750 square feet, for up to two ADUs on a lot. See California permit laws taking effect 2027 to 2028.
Garage conversion to a JADU
A JADU is the smaller conversion: at most 500 square feet of interior livable space, inside an attached garage or elsewhere within the house's walls. It is approved ministerially, needs no added parking, and counts as part of the house for utility service and fire rules. The rules a city's JADU ordinance must follow, in §66333:
- One per lot zoned for single-family residences, with a house built or proposed (§66333(a)).
- Within the walls of the house; an attached garage counts as part of it (§66333(d)). A detached garage can be an ADU, not a JADU.
- A separate entrance from the house's main entrance. Without its own bathroom, the JADU needs that separate entrance plus an interior entry to the main living area (§66333(e)).
- An efficiency kitchen: a cooking facility with appliances, and a food preparation counter and storage cabinets of reasonable size for the unit (§66333(f)).
- Owner-occupancy only when the JADU shares a bathroom with the house, and not when the owner is a governmental agency, land trust or housing organization; the owner may live in either part (§66333(b)).
- A deed restriction recorded and filed with the permitting agency, barring a separate sale and restricting the unit's size and attributes to what the article allows (§66333(c)).
- Rentals longer than 30 days (§66333(g)).
A city without a JADU ordinance still has to approve a qualifying JADU ministerially (§66335.5, §66339), and it may charge for an inspection of the JADU against building standards (§66334(b)).
Converting to habitable space that isn't a unit
A bedroom, office or family room in the garage alters the building and turns the garage into living space, so it needs a permit under the 2025 California Residential Code, which covers altering a building and changing its occupancy (§R105.1). None of the ADU protections apply: parking, setbacks and fees follow local zoning. The building code items below apply on all three paths; the ADU statutes change zoning, review, fees, sprinklers and occupancy classification, not these habitable-space rules. Read on ICC on November 15, 2026; the 2025 CRC renumbered these Chapter 3 sections, so older references use different numbers.
| Item | 2025 CRC rule | Section |
|---|---|---|
| Room size | At least 70 sq ft (kitchens excepted), and at least 7 feet in any horizontal dimension (kitchens and limited-density owner-built rural dwellings excepted) | §§R312.1, R312.2 |
| Ceiling height | At least 7 feet in habitable space; 6 feet 8 inches in bathrooms, toilet rooms and laundry rooms; exceptions for sloped ceilings and beams | §R313.1 |
| Light and ventilation | Glazing of at least 8% of the floor area and openable area of at least 4%, or the exceptions for artificial light and mechanical ventilation | §§R325.1.1, R325.1.2 |
| Heat | Where the winter design temperature is below 60°F, heating that holds 68°F in habitable rooms; portable space heaters don't count | §R325.8 |
| Sleeping room egress | One operable emergency escape and rescue opening: 5.7 sq ft net clear (5 sq ft at a grade floor), at least 24 inches high and 20 inches wide, bottom of the clear opening no more than 44 inches above the floor. Not required where the room has an exit door or exit access door that opens directly into a public way, or to a yard, court or exterior egress balcony that opens to one. Where the change of occupancy triggers the requirement, an existing operable window with at least 4 sq ft net clear, 22 inches high and 20 inches wide can serve (§R319.7.1) | §§R319.1, R319.2, R319.7.1 |
| Smoke alarms | Where permitted alterations occur, the whole dwelling unit gets smoke alarms located as for a new dwelling | §R310.2.2 |
| Carbon monoxide alarms | Required in a dwelling unit with a fuel-fired appliance or fireplace, or with an attached garage that has an opening into the dwelling | §R311.2.1 |
| Part of the garage stays a garage | Not less than ½-inch gypsum board or equivalent on the garage side, and 5/8-inch Type X or equivalent under any part of the dwelling above the garage; no opening from the garage directly into a sleeping room; other doors solid wood, or solid or honeycomb-core steel, at least 1⅜ inches thick, or 20-minute fire-rated, self-latching and self-closing or automatic-closing. Where the house and garage are sprinklered under §§R309 and R317.5.1, those other doors need only be self-closing and self-latching | §§R302.5.1, R302.6 |
Title 24 energy: the garage becomes an addition
Under the 2025 Energy Code, a garage that becomes heated or cooled space is "newly conditioned space," which "must comply with the requirements for an addition" (§100.1, read on ICC). In a single-family home that means §150.2(a), the rules for additions to existing single-family buildings (multifamily buildings have their own subchapter): the prescriptive path in §150.2(a)1 or the performance path in §150.2(a)2. The Certificate of Compliance (CF1R) goes in with the permit application and is approved before the permit issues; it is registered with an ECC-Provider when compliance needs field verification. For an addition under 300 square feet that needs no field verification, the city may waive the CF1R or accept a simplified one; the energy rules still apply (Title 24, Part 1, §10-103(a)1B, (a)1C, (a)2A). See CF1R, CF2R, CF3R and the HERS rater for how the three forms and the ECC-Rater (HERS rater) fit together.
- 700 square feet or less (prescriptive): §150.1(c) with modifications. Ceiling insulation in a ventilated attic to an assembly U-factor of 0.025 (R-38 in wood framing) in Climate Zones 1, 2, 4 and 8 to 16, or 0.031 (R-30) in 3 and 5 to 7; a radiant barrier in Climate Zones 2 to 15; window-area limits in Climate Zones 2, 4 and 6 to 15; where the existing siding stays, R-15 cavity insulation in 2×4 walls or R-21 in 2×6, with no continuous insulation. Quality Insulation Installation (QII) doesn't apply (§150.2(a)1B).
- Over 700 square feet (prescriptive): §150.1(c) with modifications. A conversion of existing unconditioned space doesn't have to insulate existing window and door headers as part of QII, or air seal where the existing air barrier isn't removed or replaced (§150.2(a)1Av).
- Exceptions that matter on a garage: no solar panels for additions (Exception 6), no ventilation cooling for additions of 1,000 square feet or less (Exception 5), and none of the roofing requirements of §150.1(c)11 for additions of 300 square feet or less (Exception 1).
- Heating and cooling. Extending the existing system: the existing equipment need not comply, but its heating capacity must be adequate (Exception 3). Extending existing ducts: the existing duct system and the extension must meet §150.2(b)1Di and 1Dii (Exception 4). Load calculations and capacity limits are in §150.2(a)1E.
- Ventilation. A new dwelling unit that is an addition, such as an ADU in a converted garage, needs whole-dwelling mechanical ventilation sized to the new unit's floor area. A JADU that is an addition, or an addition of 1,000 square feet or less to the existing home, is exempt from that airflow requirement; local exhaust applies either way (§150.2(a)1C).
- A new water heater added with the addition, on the prescriptive path, must be a heat pump water heater meeting §150.2(a)1D; for an addition of 500 square feet or less, an electric water heater with point-of-use distribution; or a system the Energy Commission's Executive Director finds uses no more energy (§150.2(a)1D).
Garages converted without a permit
State law treats an unpermitted ADU or JADU built before January 1, 2020 differently from an unpermitted bedroom. For the ADU or JADU, Gov. Code §66311.7 says:
- The city may not deny a permit because the unit violates building standards, or doesn't comply with the general provisions of the ADU chapter (Article 1) or its JADU rules (Article 3), as applicable, or a local ADU or JADU ordinance (§66311.7(a)). It may deny one if it makes a finding that correcting the violation is necessary to comply with the substandard-building standards in Health and Safety Code §17920.3, and the section doesn't apply to a building deemed substandard under §17920.3 (§66311.7(b), (c)).
- Once the city receives an application to permit the unit, its inspector may inspect it and recommend what it needs, subject to the substandard-building exclusion. If the inspector finds health and safety problems, the city may not penalize the applicant for having the unit and must approve the permits needed to correct them (§66311.7(f)).
- A homeowner applying to permit the unit pays no impact fees, connection fees or capacity charges, except when utility infrastructure is needed to meet §17920.3 and the fee is authorized by §66311.5(e) (§66311.7(e)).
- The city's public materials must tell homeowners they may get a confidential third-party code inspection from a licensed contractor before applying (§66311.7(d)(2)). That inspection is contractor work the statute names.
Separately, the owner of an ADU built before 2020 who gets a notice to correct may ask for enforcement of a building standard to be delayed five years; the enforcement agency grants it if correcting the violation isn't necessary to protect health and safety (§66331; Health and Safety Code §17980.12(a)). The same delay covers an ADU built later in a city whose ADU ordinance was noncompliant at the time and is compliant now.
A garage converted into a bedroom or family room without a permit gets none of this. It is ordinary work done without a permit: see permitting work after the fact for how that works and what a contractor risks.
Dates to know:
- March 25, 2024: ADU law moved from §65852.2 and §65852.22 to Gov. Code §66310 et seq. (SB 477, Chapter 7, Statutes of 2024).
- January 1, 2026: SB 543 (Chapter 520, Statutes of 2025) renumbered the fee rules to §66311.5 and the pre-2020 unpermitted-unit rule to §66311.7. §66333, the JADU rules, was last amended by AB 1154 (Chapter 507, Statutes of 2025), effective the same day.
- January 1, 2027: the SB 1117 impact fee rule for ADUs over 750 square feet takes effect (§66311.5).
- January 1, 2030: enforcement agencies stop approving new five-year delay requests; delays approved before then run their full term (Health and Safety Code §17980.12(a)(5)).
- January 1, 2035: Health and Safety Code §17980.12 is repealed by its own terms (§17980.12(c)).
Code basis
2025 California Building Standards Code (Title 24), which applies to permit applications filed on or after per the California Building Standards Commission. Sections checked against the published code; cities may add local amendments.
California Residential Code (Title 24, Part 2.5) §R105.1 — Permit required to construct, alter or change the occupancy of a building, or to install, alter or convert regulated electrical, gas, mechanical or plumbing systems. Converting a garage to living space alters the building, so it needs a permit; the electrical, gas, mechanical and plumbing work in it needs permit authorization too, on a combined permit or separate trade permits as the city issues them.
California Residential Code (Title 24, Part 2.5) §§R312, R313, R319, R325 — Habitable space: rooms other than kitchens of at least 70 square feet and 7 feet in any horizontal dimension, with exceptions (R312); 7-foot ceilings in habitable space, 6 feet 8 inches in bathrooms, toilet rooms and laundry rooms, with exceptions (R313); an emergency escape and rescue opening in sleeping rooms unless an exception applies (R319); and light and ventilation, natural or by the permitted artificial-light and mechanical alternatives, plus heating where the climate requires it (R325).
California Residential Code (Title 24, Part 2.5) §§R302.3, R302.5, R302.6 — Separation between dwelling units in a two-family dwelling (R302.3), and between the dwelling and any part of the garage that stays a garage, including no opening from the garage directly into a sleeping room (R302.5, R302.6).
California Energy Code (Title 24, Part 6) §§100.1, 150.2(a) — Space converted from unconditioned to conditioned is newly conditioned space and must comply as an addition (§100.1). For single-family buildings, §150.2(a) sets the prescriptive rules (split at 700 square feet, with relief for conversions of existing unconditioned space) and the performance path.
Typically needs a permit
Garage conversion needs a permit in nearly every Californiajurisdiction.
Usually no permit
- Using the garage for parking, storage or a workshop without turning it into living space
- Painting, tiling, carpeting, cabinets and similar finish work in a garage that stays a garage (2025 CRC §R105.2)
If a customer asks you to skip the permit, see what skipping the permit costs a California contractor.
Documents & plans generally required
- Site plan showing the garage, the house, property lines, setbacks and any parking that remains
- Floor plan of the converted space: room uses, ceiling heights, egress windows, and the kitchen and bathroom (an efficiency kitchen and a separate entrance for a JADU)
- Structural details for the wall that fills the garage-door opening, any new footing, and any change to load-bearing walls or the roof
- Electrical, plumbing and mechanical plans for the new circuits, fixtures and heating and cooling
- Title 24 energy compliance for the newly conditioned space; in a single-family home, on the prescriptive or performance path in Energy Code §150.2(a), on a Certificate of Compliance (CF1R) the city approves before the permit issues, registered with an ECC-Provider when compliance needs field verification. For an addition under 300 square feet that needs no field verification, the city may waive the CF1R or accept a simplified one (Title 24, Part 1, §10-103(a)1B, (a)1C, (a)2A)
- Fire separation details where part of the garage stays a garage, or where an attached ADU adjoins the house
- For a JADU, the deed restriction the city requires to be recorded and filed with it (Gov. Code §66333(c))
Before you pay someone to assemble and file the package, see what a permit expediter costs in California.
Common reasons garage conversion applications get bounced
Common across California; this is not city rejection data.
- A JADU proposed in a detached garage: a JADU must be built within the walls of the single-family residence, which includes an attached garage (Gov. Code §66333(d))
- A sleeping room without a compliant emergency escape and rescue opening where §R319 requires one (2025 CRC §R319)
- A habitable room other than a kitchen under 70 square feet, or under 7 feet in any horizontal dimension, or a habitable-space ceiling under 7 feet, where no exception in §§R312 or R313 applies
- No energy compliance shown for the newly conditioned space (Energy Code §§100.1, 150.2(a)), or no CF1R with the application where the city requires one (Title 24, Part 1, §10-103(a)1C, (a)2A)
- A door from the remaining garage directly into a sleeping room, or the garage separation not detailed (§§R302.5.1, R302.6)
- On the converted-space ADU path, an expansion of more than 150 square feet beyond the existing accessory structure, or one not limited to ingress and egress (Gov. Code §66323(a)(1)(A))
- A JADU without a separate entrance or an efficiency kitchen (Gov. Code §66333(e), (f))
Each correction round adds review time. For the review deadlines and two-review limit state law sets for housing permits (the limit starts January 1, 2027), see how long a California building permit takes.
The inspection sequence
A typical order — the number of stops and exact sequence vary by jurisdiction and scope.
- 1Slab and under-floor inspection where new drain lines are trenched into the garage slab or a raised floor is framed over it, before concrete or floor sheathing goes in (2025 CRC §R109.1.1.1)
- 2Foundation inspection for any new footing, such as one under the wall that fills the garage-door opening where the plans call for it, before concrete (§R109.1.1)
- 3Rough electrical, plumbing, mechanical and gas, before cover and before the framing inspection (§R109.1.2)
- 4Framing inspection after the rough trades are approved (§R109.1.4)
- 5Insulation inspection where the city requires one (§R109.1.5 lets the building official require other inspections), and any field verification the compliance path requires, by an ECC-Rater (HERS rater)
- 6Gypsum board inspection before taping, including fire-resistance-rated separation where it is required (§§R109.1.4.2, R109.1.5.1)
- 7Final inspection after the work is complete and before anyone moves in (§R109.1.6), with smoke alarms and any required carbon monoxide alarms in place
For what inspectors check in each trade, what a failed inspection means, and the remote inspection rules that start in 2027 and 2028, see California building inspections for contractors.
Licensing — who can pull it
A garage conversion is generally taken by a B (General Building) contractor. Business and Professions Code §7057(b) lets a B take a prime contract involving trades other than framing or carpentry when the contract requires at least two unrelated trades other than framing or carpentry, such as electrical, plumbing, insulation and drywall, or when the B holds the specialty class or subcontracts that work. A typical conversion meets that test; framing doesn't count toward the two. A B-2 (Residential Remodeling) contractor may take it only on an existing residential wood-frame structure, with at least three unrelated trades in the contract and no structural changes to load-bearing parts (§7057.5(a), (c)(2)), and it must hold the class or subcontract any installing, replacing, substantial altering or extending of electrical, mechanical or plumbing systems (§7057.5(c)(3)). The statutes don't say which licensee on a shared job applies for each trade permit, so ask the building department. An owner can also pull the permit as an owner-builder.
For what each CSLB class may take on its own, when the owner pulls the permit instead, and what the law says about pulling a permit for someone else's job, see which California contractor license can pull which permit.
How this works in your California city
Cities marked have verified local data — portal, fee schedule, and adopted code edition sourced from public city and county documents. Others link to the general ADU permit guide for that city.
FAQs
Do I need a permit to convert a garage in California?
Yes. The 2025 California Residential Code requires a permit to alter a building or change its occupancy, and to install or extend electrical, gas, mechanical or plumbing systems (§R105.1). That covers every path: an ADU, a JADU, or a bedroom, office or family room. The path decides how the city reviews the permit and which state protections apply.
Is every garage conversion an ADU?
No. An ADU is a complete independent unit with permanent provisions for living, sleeping, eating, cooking and sanitation (Gov. Code §66313(a)). A JADU is a unit of up to 500 square feet of interior livable space inside the house (§66313(d)). A bedroom or family room is living space added to the house; it is not a unit, so the ADU protections on parking, setbacks, fees and review clocks don't apply.
What is a JADU?
A junior accessory dwelling unit: at most 500 square feet of interior livable space, contained entirely within a single-family residence, with an efficiency kitchen and a separate entrance (Gov. Code §§66313(d), 66333(e), (f)). An attached garage counts as part of the house, so it can become a JADU; a detached garage can't (§66333(d)). One per lot. Owner-occupancy is required only if the JADU shares a bathroom with the house, and not when the owner is a governmental agency, land trust or housing organization; a deed restriction is recorded (§66333(b), (c)).
Do I have to replace the parking when I convert a garage into an ADU?
No. When a garage is converted to an ADU, the city may not require the lost off-street parking spaces to be replaced (Gov. Code §66314(d)(11)), and it may not impose any parking standard on an ADU that is part of the house or an accessory structure (§66322(a)(3)). A JADU ordinance may not require additional parking (§66334(a)). A conversion that is not an ADU or JADU gets none of this; local zoning decides.
How long does the city have to act on a garage conversion ADU?
Under Gov. Code §66317(a), the city has 15 business days to tell you in writing whether the application is complete, and 60 days from a complete application to approve or deny it when the lot already has a house. If it doesn't act within 60 days, the application is deemed approved. A delay you request pauses the clock. A JADU has the same 15-business-day and 60-day rules in §66335(a), without the deemed-approved sentence. These ADU and JADU deadlines don't apply to a bedroom or family-room conversion. getPermit does not publish city-specific timelines.
Can an unpermitted garage conversion be legalized?
Yes. For an ADU or JADU built before January 1, 2020, the city may not deny a permit only because the unit violates building standards or doesn't comply with the state's general ADU provisions or JADU rules, or a local ADU or JADU ordinance, unless it makes a finding that correcting the violation is necessary to comply with the substandard-building standards in Health and Safety Code §17920.3; the rule doesn't cover a building deemed substandard (Gov. Code §66311.7). A bedroom or family room converted without a permit goes through the city's ordinary process for work already done.
Does a garage conversion need Title 24 energy compliance?
Yes, if the converted space is heated or cooled. The 2025 Energy Code calls it newly conditioned space, which must meet the requirements for an addition (§100.1), so in a single-family home it follows §150.2(a): a prescriptive or performance path, shown on a Certificate of Compliance (CF1R) the city approves before issuing the permit (Title 24, Part 1, §10-103(a)2A). For an addition under 300 square feet that needs no field verification, the city may waive the CF1R or use a simplified one, but the energy rules still apply (§10-103(a)1C). Additions don't need solar panels (§150.2(a), Exception 6).